Close Menu
  • Exclusive news
  • Economy
  • The science
  • Finance
  • Developments
  • Travel
  • Society
Facebook X (Twitter) Instagram
360Bahamas – investments and real estate
  • Exclusive news
  • Economy
  • The science
  • Finance
  • Developments
  • Travel
  • Society
360Bahamas – investments and real estate
Home»Economy»How to correctly cover the walls with a plaster layer

How to correctly cover the walls with a plaster layer

December 13, 2024

The walls of the walls of the plaster layer are intended to correct wall defects, the noise of thermal insulation and with decorative targets.

Before applying the plaster layer, it is necessary to prepare surfaces.

The base should provide a solid coup with a plaster solution and hold it for a long time. To do this, on the surface designed for plastering, they make, notch, carefully clean them, and washed with water. If there are hillocks and influxes on the processed surface, then they are cut down. When cutting down, it is necessary to carefully refer to the hog under the ceiling and in the corners of the rooms, so the wiring may be there.

Seams at the joints of the walls and cracks are thoroughly selected and cleaned. Seams and potholes obtained after cutting down are sealed with cement mortar.

In the event that the surface quality does not give confidence that the plaster will fall on this surface firmly, as well as if it is supposed to apply a layer of 20 millimeters thicker, it will be correctly used by the plaster mesh.

To pull on such a grid, holes with a step of 20-30 centimeters are made in the wall under the ceiling. Plastic dowels are clogged into these holes, to which a mesh is attached using nails or screws.

To obtain a flat, vertical and horizontal surfaces, it is necessary to sister marking and fix it with beacons and brands.

Lighthouses are installed using a waterpasis, or ordinary construction weight with a load. You can use ready-made beacons in the form of a T-shaped profile or make gypsum. On concrete surfaces, the beacons are installed using the rule equipped with an angular with a vizier or a waterpol. Lighthouses must be installed through1 – 1.5 meters and each is thoroughly verified by verticality and parallelism to other surfaces.

Share. Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email

Related Posts

March 31, 2025

The service sector in the Bahamas: development features

March 31, 2025

Agriculture, forestry and fisheries in the Bahamas

March 31, 2025

Economic development of the Bahamas: features and nuances

January 22, 2025

Methods for removing paint: which option to choose

January 20, 2025

What difficulties arise in the process of demolition of buildings

January 16, 2025

We rent housing in Donetsk correctly

Latest Posts

Pink Beach on Harbour Island: an incredible calling card of the Bahamas

March 31, 2025

Lucayan National Park in the Bahamas

March 31, 2025

Sinkhole: a natural landmark of the Bahamas

March 31, 2025

Brilliant Discoveries of the Bahamas

March 31, 2025
Don't Miss

Lightning protection system for your home

December 25, 2024

Very often you can hear the opinion that lightning does not fall into the same…

The carriage for the stroller is a convenient solution for winter walks

April 16, 2019

Classes that develop the beneficial qualities of a child

December 11, 2024

Building company advertising on radio. Why is it effective?

December 17, 2019
  • Exclusive news
  • Economy
  • The science
  • Finance
  • Developments
  • Travel
  • Society
© 2017-2025 360BAHAMAS. All Rights Reserved.

Type above and press Enter to search. Press Esc to cancel.